INO PDA: Use of Bamboo for Land Stabilization, Soil Erosion Control, Water Catchment Rehabilitation, and Effluent Treatment in Citarum River Basin (Proposal)

May 31, 2016 | Author: adbwaterforall | Category: N/A


Description

This PDA will demonstrate the use of the bamboo plant in addressing massive soil erosion and water catchment degradation...

Comments

SUPPORT DOCURI